Posts Tagged ‘start of construction’
Educational and Professional Technical Team
Regional President placed the first stone of the population accompanied by educational and professional technical team.
With great expectation teachers, parents and students witnessed the beginning of a new work “Expansion and Improvement of Infrastructure and Equipment of the IE 54535 Moyabamba Baja District Chicmo Santa Maria, with a value of 728 000 069 nuevos soles.
Armed with the proper clothing for the start of construction work about 20 professional technical workers undertook the construction work of the work.
The design and this new project includes the construction of 3 classrooms, 1 auditorium, 1 store, a kitchen, toilet, tile sport, overhauling of 6 classrooms, perimeter wall with furniture and equipment (folders one-person, wooden shelves, desks, chairs) and computers.
Building Permits

The complete or partial renovation of a house may require primarily an administrative authorization.
In some cases, this approach is unnecessary and can be replaced by mandatory assistance of an architect. The renovation usually involving some work, even from top to bottom some time, the first thing to do is to get prior to the town hall, a building permit.
The building permit is required and is mandatory for all construction habitable or not, relating to changing the appearance inside or outside, to change the destination of an item or creation of additional levels to already existing building and that, even without foundations. The process is often long, so it is better engage the various procedures well before the start of construction.
Read the rest of this entry »